Server Room Load Tool

Projects · Device library · Max & Typical reports · PDF letter

Project

API: …
Disclaimer

PRELIMINARY PLANNING ONLY. Actual consumption varies by workload. For permit submissions requiring electrical code compliance (NEC Article 220), consult a licensed Professional Engineer (PE). This tool does not replace professional engineering judgment.

Room Summary

Max vs Typical
Typical
IT load (kW)
0.00
Cooling (BTU/hr)
0
Cooling (tons)
0.0
Facility (kW)
0.00
RU used
0
Max
IT load (kW)
0.00
Cooling (BTU/hr)
0
Cooling (tons)
0.0
Facility (kW)
0.00
RU used
0
Warnings: RU > 42U, rack > 8kW

Racks in selected project